Patent strategy for Taiwan and Asia
9 of 16leading foreign UAV makers hold no Taiwan patents.
Fielded systems get studied. Without Taiwan filings you have no position against local imitation and no leverage with local suppliers.
From tender to office action
Lock in your technology lead before competitors can move into the gap.
Decide what to protect first, based on Taiwan's demand
We track Taiwan's tenders for you, obtain and translate the tender documents, and set out the specification and localisation requirements, so you know which of your technologies are most worth patenting in Taiwan first.
Before launch, see what you can patent and where the risk lies
We check local patents and technology white space against a 180M-patent database. One review shows which of your technologies stand a chance of a patent and where you risk falling inside someone else's, with design‑around recommendations.
A Taiwan-first patent strategy
Once your systems are fielded in Taiwan, they can be studied and copied. We close the gaps in your Taiwan patent coverage first, then plan for Japan, Korea, Singapore, Australia, India and Europe.
Checked at every step, from filing to office action
From draft-quality review before filing to office-action strategy at 4 patent offices: Taiwan, the US, Japan and Korea. Our fee depends on whether your protection works, not on how many applications you file.
Our retainer does not depend on how much you file.
So we can tell you to file less, file differently or move budget: advice your own patent firm cannot give.
No referral fees and no preferred-firm list. Firms are recommended case by case, on technical fit.
Where our own UAV portfolio touches your fields, we tell you before you hire us.
Our neutrality commitmentsThree capabilities
Built on the 180M-patent database and analytics of Innovue, our technology partner.
Strategic intelligence
Quarterly white-space and competitor maps for Taiwan and Asia, with a watch on rising players and expiry timelines.
Application enhancement
Pre-filing strategy, draft-quality reviews and design‑around briefs for local supply‑chain adaptation.
Office-action strategy
Response direction and continuation planning before TIPO, USPTO, JPO and KIPO.
Start with a Diagnostic Sprint of 2–4 months, then a Standard or Advanced retainer, or a single module.
Request sent.
We reply by email within two business days.

